AK09-05 · 5 MIN · M09 INSTALLATION · LESSON 5 OF 6
Appliances, kickboards and end panels
Chapters
In short
- 01The finishing work goes in order. First the fillers and end panels, then the worktop, the sink and the hob, the built-in appliances and adjusting the fronts, and the kickboard last.
- 02An end panel covers the visible side of the cabinet at the end of a run. A filler closes the gap to the wall, is scribed to the wall and keeps the doors clear of it.
- 03The fitting sizes, ventilation and fixing of an appliance come from the manufacturer's instructions. Only a licensed installer makes the connections.
- 04The kickboard goes on last, when the legs are no longer adjusted. It clips onto the legs, and on an uneven floor it is scribed to the floor or gets a sealing strip.
- 05The protective film comes off gloss fronts only at the very end, after cleaning and checking every door and drawer.
Video transcriptthe narration as text
Once the cabinets are in and the worktop is in place, the kitchen still isn't quite finished. In this lesson you'll see the order of the finishing work: fillers and end panels, built-in appliances and the kickboard, and why the kickboard always goes on at the very end.
The order of the finishing work
The finishing work goes in order. First the fillers and end panels, because the worktop goes over them or above them. Then the worktop with its cut-outs, followed by the sink and the hob. Next come the built-in appliances and adjusting all the fronts. The kickboard comes last of all, once the legs are no longer being adjusted. At the very end come the cleaning and the handover to the customer.
End panels and fillers
An end panel covers the visible side of the last cabinet in a run. On a base unit it runs from the floor to the top of the carcass, covering the legs too. It sits outside the side, so the run gets wider by its thickness.
A filler closes the gap between a cabinet and the wall, with its face flush with the fronts. A wall is rarely plumb, so the filler is scribed to the wall, just like the worktop. The filler also keeps the door clear of the wall, so the door opens fully and the handle doesn't hit it.
Built-in appliances
The fitting sizes, the ventilation and the way an appliance is fixed come from the appliance manufacturer's instructions. The opening or the housing must be exactly the size the instructions give, and the air paths mustn't be blocked by the kickboard or a shelf. Water, electricity and gas are connected only by a licensed installer.
With a built-in dishwasher, a front in the kitchen's decor is fixed to the appliance door using the manufacturer's template, so it lines up with the fronts next to it. The appliance is levelled on its own feet and fixed as the instructions say.
The kickboard
The kickboard goes on at the end, when the legs are no longer adjusted. It stands against the front legs, set back behind the fronts, and clips onto them. A floor is rarely level, so the kickboard is scribed to the floor, or a sealing strip that follows the floor goes along its bottom edge.
The clips hold the kickboard on the legs, so it can come off to reach the services.
In front of the fridge and the dishwasher, check whether the instructions ask for air vents in the kickboard. If the dishwasher has its own kickboard on the door, the run's kickboard stops either side of it. In the corner, two kickboards meet.
Finally, clean the whole kitchen, open and close every door and every drawer once more, and only then peel the protective film off any high-gloss fronts.
In short
In short. The finishing work goes in order: fillers and end panels, the worktop, the sink and the hob, the appliances and adjusting the fronts, and the kickboard last. An end panel covers the visible side, and a filler is scribed to the wall and keeps the doors clear of it. The sizes and ventilation of an appliance come from the manufacturer's instructions, and a licensed installer makes the connections. The kickboard goes on when the legs are no longer adjusted. And the film comes off the gloss fronts only at the very end.
In Easy Form Studio you add a filler or an end panel with a right-click on the cabinet, under Add to the cabinet. Both boards get the decor of that cabinet's fronts and stay linked to it.
You add the kickboard for a whole run at once: select the cabinets and click Add, Kickboard over selected. If the filler was added first, the kickboard runs past it to the wall, and the clips, two per cabinet, go into the hardware list automatically, without you counting them.
The tutorial Kickboard, fillers, end panels and cornice shows the whole process, step by step, in the software.
The three-question quiz and the summary are on the academy website; the link is below the video. In the last lesson of the module: the most common fitting mistakes and complaints, and how to prevent them in the design.
Quiz
3 QUESTIONS · EXPLAINED ANSWERS